Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Preparation of the pilot, i.e. packaging and test installation by T6 developers, started at beginning of 2017/0607, since start of 2017/07 08 UAT test-installation by GEANT operations is in progress. During that installation and application dependency issues where found, identified and solved together with the T6 developers. Also an excel document of appropriate Pilot criteria/KPIs has been prepared (update of corresponding pilot criteria document for v1.1). A pilot result survey to be filled at the end of the pilot is prepared (update of pilot result survey of v1.1), too.