Name:

FoD Pilot 

Start Date:

Preparations for the pilot started in June 2017, the users are on-boarded to the pilot in October 2017.

End Date:

Expected end date for pilot is beginning of February 2018.

Pilot Description:

The pilot should test FoD version 1.5 especially its new features including:

  • traffic filtering based on the specification of port ranges
  • traffic filtering statistics

The pilot will include security team in GÉANT Operations Centre and the following NRENs: RedIRIS, LITnet and EEnet. 


Pilot Category: Technology / Service 

This is a technology pilot, with its focus on the new features that are present in FoD v 1.5 and were not available in the current production version FoD v1.1.

Required Infrastructure:

The infrastructure that is needed for the pilot includes:

  • A server with pre-installed FoD v1.5 version enabled on the networks of the NRENs that participate in the pilot - it is provided by GEANT OC and supported by JRA2 T6 team
  • End-user testing equipment - participating NRENs will ensure this equipment for themselves

Pilot participants are welcome to contact JRA2 T6 team members: Evangelos Spatharas (evangelos.spatharas@geant.org) and David Schmitz (David.Schmitz@lrz.de) about the pilot.

Users:

FoD direct users are NOC and/or CERT engineers that implement the rules, and secondarily NRENs and any GÉANT project participating organisation.

Three NRENs participate in the pilot: RedIRIS, LITnet and EEnet.  

Objectives and means of verification:

The list of objectives, critical success factors and the means of its verification is provided in the attached xls sheet.

FoD 1.5. - KPIs_2017_09.xlsx

Communication plan:

Explain how will the team communicate with pilot participants, e.g. regular (weekly/bi-weekly/...) meetings, mailing lists, instant-messaging channels,...


Additional documentation:

Provide (links to) any additional documentation as needed.

If this is a pilot of a technology, provide relevant links about the technology that is being tested, previous related work in and outside of GEANT project.

If this is a pilot of a service, provide links to Service template completed for this service.

  • No labels