This page is used by the SIG-TFN technical working group to share documents.
Working group members:
Guy Roberts (WG leader)
Jeroen Koelemeij
Jochen Kronjaeger
Raphaël Marion
Krzysztof Turza
Jacques-Olivier Gaudron
Notes and diagrams from the technical working group discussions are documented in these slide decks:
Topology options for the C-TFN: TFN_topologies_v3.pptx
Slides from the SIG-TFN meeting in Amsterdam on the 16th October. This is an overview of the design consideration for the Northern route: 241016_SIG-TFN_meeting_Koelemeij_v3.pdf
Deeper analysis of the options for the northern route: C-TFN architecture 2024-10-22 JHK v4.pptx
Draft consensus design for the northern route: C-TFN northern route consensus design DRAFT v1 .pptx
End-to-end link design: JK-end-to-end-link-design_v0.pptx
The following document is a draft of the proposed bilateral interconnect agreement that GEANT would put in place with each of the NMIs that we connect.
Version 0.2: TF-MOU-0.2.docx
The following document is a draft Invitation to Tender (ITT) for the hardware, software build and service requirements for the bi-directional amplifiers to be deployed on the GEANT C-TFN.
Draft ITT for TF amplifiers v3.0.docx
JHK-spectrum-considerations_v3.pptx
The following document shows the software requirements for monitoring the C-TFN network.
TimeMap requirements_v0.5.docx
The following documents describe the Exail RLS/MLS equipment:
Keopsys amplifier brochure: CEFA-C-BD-brochure-v2-1.pdf
Czechlight amplifier: EN_DSBD_ CzechLight optical amplifier SDN EDFA BiDi.pdf
GEANT presentation 26th July 2024.pptx