Date

Attendees

Goals

  • Status Updates of work items (FOD/RepShield), especially:
        • FoD v1.5 transition to production
          • rpm update
          • mailing list fod@lists.geant.org
              • future support mail contact
              • update of service template
        • FoD v1.6 pilot
            • extended FoD rule concept
            • new Warden connector installation
            • CentOS
  • Review Open Action Points from last VC(s)
  • Code on Github Issue solved (Tomas/Vaclav)
  • GDPR compliance
  • AOB
      • PSNC FoD Installation Issue
      • ACONET FoD EDUgain issue

Discussion items

TimeItemWhoNotes

Firewall On Demand (FoD)
  • (info page for FoD development https://wiki.geant.org/pages/viewpage.action?pageId=63965046)
  • FoD v1.5 = FoD with new functionalities: rule range specification, current rule behaviour statistic graphs, multi-tenant rule control REST-API
  • FoD v1.6 = FoD with automated rule proposal from RepShield
  • New support mailing list fod@lists.geant.org: David will ask Tryfon/Tobi to announce it
  • FoD v1.5 transition to production
  • FoD v1.6 development
      • New FoD extended rule concept: a rule can have multiple BGP FlowSpec routes (corresponding to multiple attacker IP prefixes)
          • Tomáš: working on UI part for editing/adding rules; needs to be merged with David's changes; updates of dashboard and overview UI pages
          • David: NETCONF deletion of routes with new rule concept works reliably (race condition fixed)
          • David: route SNMP statistics are now correctly mapped to FoD routes and rule in FoD DB according to new rule concept
      • FRU (Firewall Rule Updater): working with new rule concept: can create rules with multiple routes out of NShaRP DDoS events
  • OS of fod-test-lab server will be updated to newer CentOS version
  • Warden collector script on test FlowMon machine should be updated to new version by Václav
  • Evangelos will check status of ACONET's issue of accessing FoD in combination with IPv6/EDUgain

DDoS Detection/Mitigation (D/M) WG

GARR DDoS D/M PoCs/Testing Framework

      • Silvia and Nino defined draft of index for white paper reporting the findings to share knowledge with community
      • White paper writing will be started soon
      • An extract of the white paper might be used for an article in one of the upcoming issues of Connect Magazine

Next VC

In 2 weeks: 19.09.2018, 14:15-15:15 CE(S)T

Action items

  • Evangelos: check status of ACONET's issue of accessing FoD in combination with IPv6/EDUgain
  • Tomáš/David: continue to work on FoD v1.6 improved rule design
  • David: test DDos testing tool provided by Tomáš
  • Silvia, Ivana, Nino, David: agree on index for white paper about GARR DDoS Testing results/experience
  • all: next regular T6 VC: 19.09.2018, 14:15-15:15 CE(S)T


  • No labels