You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 15 Next »

Purpose

This is a staging area for material for which JRA3 is fully or partially responsible in the GN4-2 PLM Processes.

Any operational material is available at SA2.

The matrix of responsibilities for transition to production is also at SA2

Subtask to Product Mapping

eduGAIN

Target Gate: None. In production.

Main service Documents

NIF:

CBA:

  • v2 Text and Excel. Document was not formally approved by management. 
  • v1 Text. Document is over 4 years old.

PID:

Roadmap:

Service Description: GN3plus PLM Version; GN4-2 SA2 Operations Version.

Service Policy: https://technical.edugain.org/documents - Declaration v2, Consitution v2, other supplemental policies inc. CoCo v1.

Service Design Documents: 

Branding: Materials

e-Science/enhanced eduGAIN support

Target gate: Pilot

Documents

CBA: Payback Schedule (xlsx)

Roadmap: Feature in main eduGAIN roadmap. 

Service Description:

Service Policy: 

Service Design doc: Draft in progress

Pilot plan:

 

Branding/visibility:

  • Branding simply as eduGAIN support.
  • No special web presence on innovation required - bundle with overall eduGAIN innovation section.
  • Visibility - outreach at AARC, FIM4R, REFEDS meetings throughout the pilot period.
  • Already presented at REFEDS/AARC November/December 2016

 

SIRTFI

Target gate: Pilot

Documents

CBA: 

Roadmap: Feature in main eduGAIN roadmap. 

Service Description:

Service Policy: 

Service Design doc: Draft in progress

Pilot plan:

  • KPIS:

 

Branding/visibility:

  • Branding simply as eduGAIN SIRTFI support within eduGAIN.
  • No special web presence on innovation required - bundle with overall eduGAIN innovation section.
  • Visibility - outreach at AARC, FIM4R, REFEDS meetings throughout the pilot period.
  • Plans Already presented at REFEDS/AARC November/December 2016

eduroam

Target gate: None, in production.

Main Service Documents:

NIF:

CBA:

PID:

Roadmap:

Service Description:

Service Policy:

Service Design Documents:

eduroam as a Service

Target gate: Pilot

Documents:

CBA:

Roadmap:

Service Description:

Service Policy:

Service Design Documents:

Pilot Plan:

KPIS:

Branding: TBD

InAcademia

Target gate: Pilot

Documents

CBA: (GN4-1 format) - rebaseline to payback schedule during pilot

Roadmap:

Service Description: Section 11 of CBA

Service Policy:

Service Design Documents:

Pilot Plan: Draft

KPIS: Section 5 of CBA

Branding: 

eduTEAMS

Target gate: Pilot

Documents

CBA: In Progress

PID: How does this relate to the GN4-2 workplan?

Roadmap:

Service Description:                          COPaaS.pptx                     (Needs updating/customising)

Service Policy:

Service Design Documents: Functional Architecture ; Technical Architecture ; VM Platform

Pilot Plan: TBC - Umbrella in Q1 2017...what else?

Branding: In progress

Baselined Operational Reqs: In prgress

IdP as a Service

Target gate: Design

Documents

CBA:

Baselined PID:

Baselined Roadmap:

Baselined Service Description:

Baselined Service Policy:

Service Design Documents:

 

 

  • No labels